How to Make a Call Sheet: Steps, Checklist and Template

How to make a call sheet in 8 steps: what goes on it, how to set staggered call times, the mistakes that make crew late, and how to get every confirmation.

By the CreativeBase team · Updated · 6 min read

To make a call sheet, lock the day's schedule, set the general crew call, give each person their own call time, add the location, parking and nearest hospital, add weather and sun times, then send it the evening before and get a confirmation from every person.

That is the whole job. The rest of this guide is how to do each step so nobody shows up at the wrong door at 6am.

In short:

  • A call sheet is one page per shoot day: who, when, where, and what happens in what order.
  • Build it from a locked schedule, stagger the call times, and put parking on its own line.
  • Send it once, the night before, and chase every confirmation before you sleep.

Who makes the call sheet

On bigger film and TV shoots, the 1st assistant director builds it from the shooting schedule and the production office sends it. On music videos, commercials and photo shoots, it is usually the producer or a production coordinator (Wrapbook).

If you are directing and producing your own job, congratulations, it is you.

What goes on a call sheet

Use this as your checklist, or as a call sheet template if you are starting from a blank page:

On many North American sets the first meal is due within six hours of crew call (LA411). Put lunch where that rule puts it.

Shooting stills? Use the photo shoot call sheet template, which is built from looks instead of scenes.

How to make a call sheet, step by step

1. Start from a locked schedule

The call sheet comes from the schedule, never the other way round. Know the order of the day first: which shots or looks, at which location, with which people. If the schedule is still moving, the call sheet will be wrong by breakfast.

2. Set the general crew call

Work back from the first shot. Want to roll at 8:00 and lighting takes an hour? General call is 7:00. Add time for a long load-in or a walk from parking.

3. Stagger the individual call times

Not everyone needs to arrive at dawn:

Who When to call them
Hair and makeup 15 to 30 minutes before talent, to set up
Talent Their HMU time before they are needed. 45 minutes of makeup for an 8:30 shot means a 7:45 call
Grip, electric, camera General call, earlier for a big build
Late talent, second unit When they are actually needed

Staggered calls save money and goodwill. Nobody enjoys three hours in holding.

4. Write the schedule

List each block with a time: setup, shots, company moves, meals, wrap. Give company moves their own lines. A move always takes longer than anyone says it will.

5. Add location, parking and hospital

Write exactly where to go in: "Rear loading door off the alley." "Ask for Stage 2 at the front desk." Parking gets its own line. Look up the nearest emergency room now, not when you need it.

6. Add weather and sun

Check the forecast the afternoon before you send. Include sunrise and sunset for any exterior or window-light work. If rain is possible, write the rain plan.

7. Add contacts and notes

Producer and whoever runs the floor go at the top. Department notes go last: anything unusual about today.

8. Proofread, then send once

Read it start to finish against the schedule. Check every call time, the date and the day number. Then send.

Common call sheet mistakes

  1. Wrong date or day number. Copying yesterday's sheet and forgetting the header is the classic (Wrapbook).
  2. No parking line. The address is right, nobody knows where to park, the whole crew is 15 minutes late.
  3. One call time for everyone. Talent waits for hours, or makeup starts late and the first shot slips.
  4. Lunch at hour seven. A hungry crew is a slow crew, and on union jobs every late half hour is a meal penalty (Storiara).
  5. Several versions. Version 3 at 11pm means half the crew reads version 2. If you must revise, say what changed at the top.
  6. Gate codes in a forwarded PDF. Put codes in each person's own message, not on a sheet that travels.
  7. No hospital. Two minutes to look up. Matters only when it matters a lot.
  8. No confirmation check. Sent is not the same as read.

Sending it and getting confirmations

Send the call sheet the evening before each shoot day, once the schedule is final (Wrapbook). For a one-day job, send a draft to department heads a few days out and the final the night before.

The call sheet goes out at 9pm. The gaffer reads it at 6am. Make it readable at 6am:

What to look for in call sheet software

If you send call sheets every week, a spreadsheet stops paying for itself. The best call sheet software for commercial, music video and photo work does a few jobs well:

Job Why it matters
Send each person their own call time The one line they read
Track who confirmed So you sleep
Fill in weather, sun and hospital Less copying, fewer mistakes
Pull crew from a saved list No retyping phone numbers
Flag what is missing before you send Catches the wrap-before-call typo

Scheduling a feature from a screenplay is a different job. StudioBinder and other script-based tools are built for scene breakdowns and stripboards, which this kind of call sheet does not need.

Doing this in CreativeBase

In CreativeBase the call sheet is one section of each production, so it pulls from what the production already holds. A call sheet rebuilt from last week's PDF is the same hour of work every time. One built inside a system gets faster with every job.

Limits, plainly: the forecast reaches about 16 days out, so later dates get sunrise and sunset only until it arrives. There is no script breakdown or stripboard. Grizzo, the AI assistant, can read a call sheet but does not build or send one.

Accounts start with a short call, where pricing is set. Crew and clients you invite use it free.

Questions people ask

What is a call sheet?

A call sheet is the one-page plan for a shoot day, sent to everyone working it. It lists the general crew call and each person's own call time, the location and parking, the schedule, key contacts, the nearest hospital and the weather.

Who makes the call sheet?

On larger film and TV shoots the 1st AD prepares it and the production office sends it. On music videos, commercials and photo shoots it is usually the producer or production coordinator.

When should a call sheet be sent?

The evening before each shoot day, once the schedule is final. Too early invites changes, and three versions in one day means half the crew reads the wrong one.

Is there a free call sheet template?

Yes. Our photo shoot call sheet template lays out every section with an example day, and the checklist in this guide works as a template for any video shoot.

What is the best call sheet software?

It depends on the work. Narrative film teams scheduling from a screenplay often use StudioBinder. For commercials, music videos and photo shoots, pick a tool that sends each person their own call time and tracks who confirmed.

How do you know everyone got the call sheet?

Ask each person to confirm, then check confirmations against the crew list before you go to bed. Call anyone who has not answered.

More guides